10MW Solar plant change of connectivity

10MW Solar plant change of connectivity

0
0

 

10MW Solar plant change of connectivity from TPS-I switchyard to 130MW PSS through the 15MW plant Jakson line- cable excavation and end termination.

For more information please see below link:

Anand Gupta Editor - EQ Int'l Media Network