5GW Solar Manufacturing Plant linked with 10GW Solar PV Power Plant
116
0
Selection of Solar Power Developers for Setting up of 5GW (Per Annum) Solar Manufacturing Plant linked with Power Purchase Agreements (PPAs) for ISTS Connected Solar PV Power Plant under Global Competitive Bidding (Phase-I)
For more information please see below link:
Related posts:
- Benchmark cost For Grid contractor Rofftop and small solar power plants programmer for the year 2017-18
- Supply and fixing Solar Light in Np Khaga
- DESIGN FABRICATION SUPPLY INSTALLATION TESTING COMMISIONING OPERATION AND MAINTENANCE FOR PERIOD OF 5 YEARS OF 20KW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT
- SITC OF Solar Power plant roof top in Govt. School under CSR of DABH Indore