Under Swachh Bharat Mission, 48 MSW based plants with cumulative installed capacity of 412.5 MW under various stages construction
About 8.2 GW Biomass Power Projects already set up in the country

Minister of State (IC) for Power and New & Renewable Energy, Shri Raj Kumar Singh, in a written reply to a question on total power generated in the country from the Municipal Solid Waste (MSW), in Lok Sabha today informed that the present installed capacity of power generation from the MSW is 65.75 MW which is about 0.02% of total power generation capacity in the country. The state-wise details of six Municipal Solid Waste to Energy plants set up, as on 15.12.2017, are given below:

Minister of State (IC) for Power and New & Renewable Energy, Shri Raj Kumar Singh, in a written reply to a question on total power generated in the country from the Municipal Solid Waste (MSW), in Lok Sabha today informed that the present installed capacity of power generation from the MSW is 65.75 MW which is about 0.02of total power generation capacity in the countryThe statewise details of six Municipal Solid Waste to Energy plants set up, as on 15.12.2017, are given below:

SNo. State / UTs Plant Commissioned/Under trial Installed Capacity

(MW)

1. Delhi M/s Ramky Group at NarelaBawana, New Delhi 24.0

 

2. Delhi M/s Jindal Urban Infrastructure Pvt Ltdat Okhla, New Delhi 16.0

 

3. Delhi M/s IL&FS Environment Infrastructure and Services Ltdat Ghazipur, New Delhi 12.0

 

4. Madhya Pradesh M/s Essel Infra at Jabalpur 9.0
5. Maharashtra M/s Solapur Bioenergy Systems PvtLtd at Solapur 3.0
6 Himachal Pradesh M/s Elephant Energy Private Limited at Shimla 1.75

Further, Shri Singh informed that under Swachh Bharat Mission (SBM) of the Ministry of Housing and Urban Affairs, 48 MSW based plants with cumulative installed capacity of 412.5 MW are under various stages constructionDetails of these projects are given below:

S.No. State City Total (MW)
1 Andhra Pradesh Guntur 15
2 Andhra Pradesh Tirupati 6
3 Andhra Pradesh Vizinagaram 4
4 Andhra Pradesh Tadapalligudam 5
5 Andhra Pradesh Machalipatnam 4
6 Andhra Pradesh Kadappa 5
7 Andhra Pradesh Anantapur 4
8 Andhra Pradesh Nellore 4
9 Andhra Pradesh Karnul 1
10 Andhra Pradesh Vishakapatnam 5
11 Bihar Patna 10
12 Chhattisgarh DurgBhilai 5
13 Chhattisgarh Raipur 5
14 Goa Pernem 5
15 Gujarat Surat 13.5
16 Haryana Karnal 3.5
17 Haryana Sonepat 5
18 Haryana Bandhmadi 10
19 Haryana Faridabad 10
20 Himachal Pradesh Shimla 1.7
21 J&K Srinagar 6.5
22 Jharkhand Ranchi 11
23 Jharkhand Dhanbad 12
24 Karnataka Bengaluru (7 plants) 20
25 Kerala Kochi 10
26 MP Bhopal 20
27 MP Rewa 6
28 MP Indore 20
29 MP Gwalior 10
30 Maharashtra Nagpur 11.5
31 Manipur Imphal 2
32 New Delhi Kidwai Nagar 1.6
33 Odisha Bhubaneswar & Cuttack, Odisha 11.5
34 Punjab Amritsar 11.5
35 Rajasthan Jaipur 15
36 Rajasthan Kota 7
37 Rajasthan Jodhpur 3
38 Tamil Nadu Pallavapuram&TambaramVenkatamangalam Project 4
39 Telangana Cluster of 18 ULBs MS Shalivahana  MSWM Green Enenrgy Ltd 12
40 Telangana Cluster of 16 ULBs (M/s Hemasri Power Projects Ltd.) 12.6
41 Telangana Greater Hyderabad Muncipal Corporation (RDF Power Projects Ltd.) 11
42 Telangana Greater Hyderabad Municipal Corporation  (SELCO) 6.6
43 UP Kanpur 15
44 UP Agra 10
45 UP Rampur 8
46 UP Meerut 10
47 Uttarakhand Roorkee (Cluster of 18 ULBs) 11
48 Punjab Amritsar Cluster (include Amritsar, Jandiala, Patti, Tarantaran, Raja Sansi, Majitha, Rayya, Khemkaran) 12
Total 412.50

The Swachh Bharat Mission under the Ministry of Housing and Urban Affairs provides incentive up to 35of project costs for Solid Waste Management projects including waste to energy plantsThe projects under PPP mode are encouraged, to invite private capital in urban infrastructure as well as to bring in private sector efficiency in delivery of urban services and operation and maintenance.

The Minister also stated that the Ministry has set a target of installing 10 GW power capacity from biomass by 2022So far about 8.2 GW biomass power projects have already been set up in the countryStatewise details of Biomass Power Cogeneration plants set up in the country as on 31.11.2017 are given below:

SNo.

 

States / UTs

 

Biomass Power / Cogeneration

(Megawatt)

1 Andhra Pradesh 378.20
2 Bihar 113.00
3 Chhatisgarh 228.00
4 Gujarat 65.30
5 Haryana 96.40
6 Karnataka 1452.00
7 Madhya Pradesh 93.00
8 Maharashtra 2065.00
9 Odisha 50.40
10 Punjab 179.00
11 Rajasthan 119.30
12 Tamil Nadu 878.00
13 Telangana 158.10
14 Uttar Pradesh 1933.00
15 Uttarakhand 73.00
16 West Bengal 300.00
Total 8181.70

*******

Source: pib.nic.in