Draft concept note on Merit Order Operation-Flexibiling in Generation and Scheduling of Thermal Power Stations to reduce the cost of power to the consumer
144
0
Draft concept note on Merit Order Operation-Flexibiling in Generation and Scheduling of Thermal Power Stations to reduce the cost of power to the consumer
For more information please see below link: