Supply, Installation, testing and Commissioning of 35kWp Grid Connected Roof Top Solar PV System at GPO Shillong Meghalaya Division under NE Circle.
28
0
Supply, Installation, testing and Commissioning of 35kWp Grid Connected Roof Top Solar PV System at GPO Shillong Meghalaya Division under NE Circle.
For more information please see below link:
Related posts:
- Design & Engineering, Manufacture / Procurement, Supply, Installation, Testing and Commissioning of Ground Mounted Grid Connected Solar Photovoltaic Power Plant of nominal array capacity 10 MWp on turnkey basis
- Design, Supply, Transportation, Installation, Commissioning and 5-years Comprehensive Maintenance of 3601 nos. of Solar Home Lighting Standalone systems each of capacity 300Wp
- Pre-Bid Tie-up for Design, Supply, Installation, Commissioning with 5 Years Comprehensive Warranty and Maintenance of White LED based off grid Solar Home Systems for Electrification of UE HHs in Villages and Dhanies under Saubhagya Scheme in Rajasthan
- Design & Engineering, Manufacture / Procurement, Supply, Installation, Testing and Commissioning of Ground Mounted Grid Connected Solar Photovoltaic Power Plant of nominal array capacity 07 MWp on turnkey basis
tags:
INSTALLATION Supply testing and Commissioning of 35kWp Grid Connected Roof Top Solar PV System at GPO Shillong Meghalaya Division under NE Circle.