![Notice for Issuance of the Bid Documents for Selection of the Project Sponsors for Implementation of Grid Tied Solar Power Projects having 50-60 MW (AC) Capacity on a Build Own and Operate (BOO) Basis](https://www.eqmagpro.com/wp-content/uploads/2019/02/Notice-for-Issuance-of-the-Bid-Documents-for-Selection-of-the-Project-Sponsors-for-Implementation-of-Grid-Tied-Solar-Power-Projects-having-50-60-MW-AC-Capacity-on-a-Build-Own-and-Operate-BOO-Basis.jpg)
Notice for Issuance of the Bid Documents for Selection of the Project Sponsors for Implementation of Grid Tied Solar Power Projects having 50-60 MW (AC) Capacity on a Build Own and Operate (BOO) Basis
30
0
Notice for Issuance of the Bid Documents for Selection of the Project Sponsors for Implementation of Grid Tied Solar Power Projects having 50-60 MW (AC) Capacity on a Build Own and Operate (BOO) Basis.
For more information please see below link:
Related posts:
- Design Engineering, Manufacture Procurement, Supply, Installation, Testing, Commissioning of 10 MW Ground Mounted Solar Photovoltaic Power Plant at SgTPP, WB in turnkey basis including warrantee obligation with 5 years Operation Maintenance
- Supply of Grid Interactive Solar Inverter
- Installing solar street lights at Institute
- Implementation of Solar Energy Based Dual Pump mini water Supply Scheme at Dist Kolhapur