![DESIGN FABRICATION SUPPLY INSTALLATION TESTING COMMISIONING, OPERATION AND MAINTENANCE FOR PERIOD OF 5 YEARS OF TOTAL 50KW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT](https://www.eqmagpro.com/wp-content/uploads/2019/02/DESIGN-FABRICATION-SUPPLY-INSTALLATION-TESTING-COMMISIONING-OPERATION-AND-MAINTENANCE-FOR-PERIOD-OF-5-YEARS-OF-TOTAL-50KW-CAPACITY-GRID-CONNECTED-SOLAR-PV-POWER-PLANT.jpg)
DESIGN FABRICATION SUPPLY INSTALLATION TESTING COMMISIONING, OPERATION AND MAINTENANCE FOR PERIOD OF 5 YEARS OF TOTAL 50KW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT
42
0
DESIGN FABRICATION SUPPLY INSTALLATION TESTING COMMISIONING, OPERATION AND MAINTENANCE FOR PERIOD OF 5 YEARS OF TOTAL 50KW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT UNDER ROOF-TOP NET METERING AT NEW ADM. BUILDING MCL WARORA DIST. CHANDRAPUR
Tender Value in Rs.: 27,50,000
For more information please see below link:
Related posts:
- DESIGN FABRICATION SUPPLY INSTALLATION TESTING COMMISIONING, OPERATION AND MAINTENANCE FOR PERIOD OF 5 YEARS OF TOTAL 50KW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT
- 2000MW ISTS Connected Wind Power Projects (Tranche-V)
- SOLAR WATER HEATING SYSTEM
- Expression of Interest EOI For Solar Grid Tied Inverter Technology Transfer
tags:
DESIGN FABRICATION SUPPLY INSTALLATION TESTING COMMISIONING OPERATION AND MAINTENANCE FOR PERIOD OF 5 YEARS OF TOTAL 50KW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT