Corrigendum 2 – 1000 MW Dholera Solar Park Tender (Phase V)
76
0
Corrigendum 2 – 1000 MW Dholera Solar Park Tender (Phase V)
For more information please see below link:
Related posts:
- Design, Supply, Installation & Commissionning of 800KWp Solar roof top system in NTPC Darlipali
- GSECL received LoA from GUVNL for establishing 100MW grid connected Solar Photo Voltaic Power Project at Ultra Mega Solar Park at Raghanesda
- Masdar to develop 500 MW wind power project in Uzbekistan
- Dutch pension fund APG eyes Tata Power’s RE InvIT