MNRE:Amended Guidelines for installation of prototype wind turbine models.
Ministry issued guidelines for installation of prototype wind turbine models on 22.05.2012. Amendments to these guidelines were issued on 20.09.2012 and on 01.06.2016. To facilitate the stakeholders the guidelines with amendments are being issued by the Ministry as under: The Ministry has decided to permit the installation of a limited number of prototype wind turbines to facilitate indigenization and encourage national industry. The guideline document is applicable for all the wind turbine manufacturers in India, who wish to install prototype wind turbine model(s) in the country and synchronize with the Indian grid system. It is desirable to allocate land on “footprint basis” for installation of prototype wind turbine(s). The Ministry’s D.O. letter no. 61/20/2011-WE dated 15.05.2012 may be referred in this regard. The guidelines will be implemented by the National Institute of Wind Energy (NIWE), Chennai. The installation of a prototype wind turbine model will be allowed only to carry out type testing for obtaining type certificate from Internationally Accredited Certifying Agencies.
For more Information Pls.Go Through Below Attached PDF…..
Related posts:
- Joule is Named in the 2015 Global Cleantech 100 for its Innovative Liquid Fuels
- MNRE Biogas Technology Development Division : Shortlisted oraganisation on their technical bids for Independent Evaluation study of National Biogas & Manure Management Programme
- Moving beyond coal for green power: How to create an alternative economy using DMF funds in coal mining areas
- Rise and Fall of Carbon Credits: Finding Solutions for Climate Crisis in Free Market