SUPPLY, UNLOADING AT SITE,INSTALLATION, LAYING & PERFORMANCE DEMONSTRATION OF 1 MM THK HDPE LINER OVER SOLAR EVAPORATION POND/SOLID STORAGE AREA.
0
0
SUPPLY, UNLOADING AT SITE,INSTALLATION, LAYING & PERFORMANCE DEMONSTRATION OF 1 MM THK HDPE LINER OVER SOLAR EVAPORATION POND/SOLID STORAGE AREA.
For more information please see below link:
Related posts:
- Extension – Grid connected 2 MW Solar PV Project for Kolkata Port Trust at Haldia Dock Complex
- EXTENSION OF BID SUBMISSION DATE FOR 10 MW SOLAR PV PROJECTS AT DRDO PREMISES, KOLAR. KARNATAKA
- DESIGN, ENGINEERING, PROCUREMENT, SUPPLY, ERECTION, TESTING, CONSTRUCTION, CIVIL WORKS AND COMMISSIONING OF SOLAR POWER EVACUATION AT KASBE-DIGRAJ, SANGLI DISTRICT, MAHARASHTRA
- 15 KWp Floating Solar PP at Jor Pukhuri with 20 LED Street lights