NTPC Floats Tender For Two No 40 Kwp Off Grid Solar PV Plant At Seva Kunj Chapki at RHSTPS
0
0
Design,Supply ,Installation and commissioning of two no 40 Kwp off gridsolar PV plant at Seva Kunj Chapki at RhSTPS
For more information please see below link:
Related posts:
- External Safety Audit of Thermal, Gas and Solar Plant for the year 2019 at NTPC Dadri
- PROCUREMENT OF ELSTER MAKE ENERGY METER FOR SOLAR PLANT JAJRU AT NTPC
- Supply of DC Cable for Solar Plant at NTPC Faridabad
- PROCUREMENT OF 6 SQ MM DC POWER CABLE FOR 15 MW SOLAR POWER PLANT INSTALLED AT JAYANT SINGRAULI
tags:
NTPC Limited