MSEDCL 500 MW STU Phase-IV
1. Bid submission: 30/11/2019
2. Pre-Bid Meeting: 22/11/2019
3. Ceiling Tariff: 2.90/kWh
4. EMD: 5 Lakh / MW
5. PPA : 30 Day + LOA
6. FC: 9/12 Months + PPA
7. Commissioning: 15/18 months + PPA