![In the matter of: Revision of tariff of Pragati-III Combined Cycle Power Station (1371.2 MW) for the period from COD of GT-1 to 31.3.2014 after truing up exercise](https://www.eqmagpro.com/wp-content/uploads/2019/11/Revision-of-tariff-of-Pragati-III-Combined-Cycle-Power-Station-1371.2-MW-for-the-period-from-COD-of-GT-1-to-31.3.2014-after-truing-up-exercise.jpg)
In the matter of: Revision of tariff of Pragati-III Combined Cycle Power Station (1371.2 MW) for the period from COD of GT-1 to 31.3.2014 after truing up exercise
0
0
In the matter of: Revision of tariff of Pragati-III Combined Cycle Power Station (1371.2 MW) for the period from COD of GT-1 to 31.3.2014 after truing up exercise
For more information please see below link:
Related posts:
- IN THE MATTER OF: Seeking approval of transmission tariff
- In the matter of: Determination of tariff of Chamera-III Hydroelectric Project (231 MW) for the period 2014-19
- In the matter of: Petition for recovery of unrecovered energy charges due to shortfall in energy generation for reasons beyond the control of generating station
- Petition seeking approval of Annuity model in terms of CERC for recovering Safeguard Duty Claim on account of Change in law