![Petition – Grant of Connectivity, Long-term and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009](https://www.eqmagpro.com/wp-content/uploads/2019/11/Petition-Grant-of-Connectivity-Long-term-and-Medium-term-Open-Access-in-inter-State-Transmission-and-related-matters-Regulations-2009.jpg)
Petition – Grant of Connectivity, Long-term and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009
0
0
Petition under Section 79(1)(c) read with Section 79(109f) of the Electricity Act, 2003 and Regulation 32 of the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009.
For more information please see below link:
Related posts:
- Application for adoption of Transmission Charges with respect to the Transmission System being established by Bikaner-Khetri Transmission Limited
- Petition of Srijan Energy System is disposed of
- Petition for adoption of tariff for 840 MW Wind-Solar Hybrid Power Projects (Tranche-I) connected to ISTS
- Petition for approval of introduction of the Green Term-Ahead Market (RE) Contracts at PXIL