Petition- For Adoption of Tariff for the 480 MW Wind Power Projects (Tranche-VII) connected to the Inter-State Transmission System
0
0
Petition under Section 63 of the Electricity Act, 2003 for Adoption of Tariff for the 480 MW Wind Power Projects (Tranche-VII) connected to the Inter-State Transmission System and selected through Competitive Bidding Process as per the Guidelines issued by Ministry of Power on 8.12.2017
For more information please see below link:
Related posts:
- Petition for adoption of tariff for the Scheme for 480 MW Wind Power Projects (Tranche-VII)
- In the matter of: Petition for adoption of tariff for 550 MW Wind Power Projects connected to the Inter-State Transmission System
- In the matter of: Revision of tariff of Pragati-III Combined Cycle Power Station (1371.2 MW) for the period from COD of GT-1 to 31.3.2014 after truing up exercise
- Petition of the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010