In the matter of: Determination of Point of Connection (PoC) rates and transmission losses for the period of October to December, 2019
0
0
In the matter of: Determination of Point of Connection (PoC) rates and transmission losses for the period of October to December, 2019 in accordance with Regulation 17(2) of Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 and amendments thereto