![In the matter of: Petition for adoption of tariff for 1200 MW Wind Power Projects (Tranche-V) connected to the Inter-State Transmission System (ISTS)](https://www.eqmagpro.com/wp-content/uploads/2019/12/Petition-for-adoption-of-tariff-for-1200-MW-Wind-Power-Projects-Tranche-V-connected-to-the-Inter-State-Transmission-System-ISTS.jpg)
In the matter of: Petition for adoption of tariff for 1200 MW Wind Power Projects (Tranche-V) connected to the Inter-State Transmission System (ISTS)
0
0
In the matter of: Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 1200 MW Wind Power Projects (Tranche-V) connected to the Inter-State Transmission System (ISTS) and selected through competitive bidding process as per the Guidelines issued by Ministry of Power on 8.12.2017
For more information please see below link: