![Petition for adoption of tariff for 600 MW Solar PV Projects](https://www.eqmagpro.com/wp-content/uploads/2020/01/Draft-Central-Electricity-Regulatory-Commission-Power-System-Development-Fund-Regulations-2019.png)
Petition for adoption of tariff for 600 MW Solar PV Projects
0
0
Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 600 MW Solar PV Projects (TrancheII) connected to the inter-State Transmission System (ISTS) and selected through Competitive Bidding Process
as per the Standard Bidding Guidelines dated 3.8.2017
For more information please see below link:
Related posts:
- In the matter of: CERC (T&C of Tariff) Regulations, 2014 for recoupment of under recovered energy charges due to shortfall in energy generation
- Draft GERC (Electricity Supply Code and Related Matters) (Second Amendment) Regulations, 2019
- CERC (Sharing of Revenue Derived from Utilization of Transmission Assets for Other business) Regulations
- Petition filed for adoption of tariff for 680 MW solar power under Section 63 of the Act