In the matter of: Petition for adoption of tariff for 480 MW Wind Power Projects
0
0
In the matter of: Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 480 MW Wind Power Projects (Tranche-VII) connected to the Inter-State Transmission System and selected through competitive bidding process as per the Standard Bidding Guidelines
issued by Ministry of Power dated 8.12.2017.
For more information please see below link:
Related posts:
- In the matter of: Petition for adoption of tariff for 1200 MW Wind Power Projects (Tranche-V) connected to the Inter-State Transmission System (ISTS)
- Petition for adoption of tariff for the Scheme for 480 MW Wind Power Projects (Tranche-VII)
- In the matter of: Petition for adoption of tariff for 550 MW Wind Power Projects connected to the Inter-State Transmission System
- Inviting Comments on the Discussion Paper on Determination of Generic Tariff for Wind Power Projects for 2021-22
tags:
wind power projects