In the matter of : Seeking direction to Indian Railway to make payment of open access charges on energy drawn through open access
0
0
In the matter of petition filed under Section 42 read with Section 33(4), 86(1)(a), 86(1)(c), 86(1)(f) & 86(1)(k) of the Electricity Act, 2003, Clauses 18.15, 18.16, 18.18, 18.19 & 18.20 of MPERC (Terms & Conditions Intra-State Open Access in Madhya Pradesh) Regulation, 2005 and all other provisions enabling in that behalf, for direction to Indian Railway to make payment of open access charges on energy drawn through open access.
For more information please see below link:
Related posts:
- Eighth amendment to MPERC (Cogeneration and Generation of Electricity from Renewable Source of Energy) (Revision-1) of Regulations, 2010
- MP Invites Bids for “Consultancy Support in Determination of Tariff for Procurement of Electricity Generated from Renewable Energy Sources”
- MPERC Determined Pre Fixed Levelized Tariff of Rs. 3.07/kWh for KUSUM Scheme Solar Projects
- Second Amendment to MPERC (Grid connected Net Metering) Regulations, 2015
tags:
MPERC