![Petition of PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations 2014](https://www.eqmagpro.com/wp-content/uploads/2020/03/Petition-of-PSERC-Terms-and-Conditions-for-Determination-of-Generation-Transmission-Wheeling-and-Retail-Supply-Tariff-Regulations-2014.jpg)
Petition of PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations 2014
0
0
Petition for True Up for FY 2018-19, Annual Performance Review (APR) for FY 2019-20 of the First Control Period & MYT Petition (ARR & Tariff Proposal for the second Control Period From FY 2020-21 to FY 2022-23) under Regulation 60 of PSERC (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations 2014
For more information please see below link:
Related posts:
- In the matter of: Petition to extend the settlement of Net Energy from billing period to yearly basis
- PROVN OF 29 KW ON GRID ROOF TOP SOLAR POWER PLANT AT PALAMPUR
- Petition for adoption of tariff for 150 MW grid connected floating Solar Power Projects
- MERC Allows Partial Adjustment of Open Access Credit Units