In the matter of: Approval for determination of Transmission tariff from COD

In the matter of: Approval for determination of Transmission tariff from COD

0
0

In the matter of: Approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission tariff from COD to 31.3.2019 for Asset-1: Replacement of existing 1 no.50 MVA, 220/132 kV ICTs by 160 MVA, 220/132 kV ICT at Balipara Sub-station along with replacement of 132 kV equipment Asset-2: 2nd 400/220 kV, 315 MVA ICT, new 220 kV Bus arrangement (GIS) with 4 nos. of 220 kV Bays at Bongaigaon Sub- station of POWERGRID along with stringing of 2nd Circuit of 220 kV D/C Bongaigaon-Salakati TL and 1 no. of 220 kV line bay at Salakati Sub-station (for 220kV D/C Bongaigaon-Salakati TL) under “North Eastern Region Strengthening Scheme-III (NERSS-III)” in North Eastern Region.

For more information please see below link:

In the matter of: Approval under Regulation-86 of CERC (Conduct of Business) Regulations,1999 and CERC (Terms and Conditions of Tariff) Regulations, 2009 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of,
(i) Truing up Transmission tariff for 2009-14 tariff block &
(ii) Transmission tariff for 2014-19 tariff block

For Transmission System Associated with Augmentation of Transformation Capacity in Northern region Part-A” in Northern Region consisting of Asset-I: 500 MVA, 400/220/33 kV ICT-I along with associated bays at Moga S/s; Asset-II: 500 MVA, 400/220/33 kV ICT-II along with associated bays at Moga S/s; Asset-III: 500 MVA 400/220 kV Spare Transformer for Northern Region at Neemrana.

In the matter of: Approval of transmission tariff for Asset I – STATCOM System (+/-) 300 MVAR complete in all respect including Coupling transformer, Mechanically switched compensation (2×125 MVAR reactor), cooling system & STATCOM protection/ controller etc. at Ranchi Substation and Asset II – STATCOM System (+/-) 200
MVAR complete in all respect including Coupling transformer, Mechanically switched compensation (2×125 MVAR reactor and 2×125 MVAR Capacitor), cooling system & STATCOM protection/ controller etc. at Kishanganj Substation under “Eastern Region Strengthening Scheme –XI (ERSS-XI)” in Eastern Region from COD to 31.3.2019 under Regulation 86 of Central Electricity Regulatory Commission (Conduct of business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014