1. Home
  2. Policy & Regulation
  3. Petition for adoption of tariff for 600 MW (out of 1200 MW) Wind- Solar Hybrid Power Projects (Tranche-II) connected to the Inter-State Transmission System and selected through competitive bidding process
Petition for adoption of tariff for 600 MW (out of 1200 MW) Wind- Solar Hybrid Power Projects (Tranche-II) connected to the Inter-State Transmission System and selected through competitive bidding process

Petition for adoption of tariff for 600 MW (out of 1200 MW) Wind- Solar Hybrid Power Projects (Tranche-II) connected to the Inter-State Transmission System and selected through competitive bidding process

0
0

Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 600 MW (out of 1200 MW) Wind- Solar Hybrid Power Projects (Tranche-II) connected to the Inter-State Transmission System and selected through competitive bidding process as per the Guidelines issued by Ministry of New and Renewable Energy dated 25.5.2018. Solar Energy Corporation of India Limited

For more information please see below link:

Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *