India June 9, 2020 Anand Gupta 0 Appointment to the post of Director (Technical) – Reg. 0 0 0 00 0 0 more now viewing Appointment to the post of Director (Technical) – Reg. June 9, 2020 Anand Gupta now playing Petition seeking determination of Fuel Cost for Biomass based Renewable Energy power plants for FY 2024-25 - EQ June 9, 2020 Anand Gupta now playing SECI Issue Tender for Supply of of 12 MW (AC) Solar PV Power Plant System at Phey, Leh, UT of Ladakh, India - EQ June 9, 2020 Anand Gupta now playing eRA Result for NTPC's 1000 MW Hybrid Tranche-VI Bid - EQ June 9, 2020 Anand Gupta now playing Floating Solar Technology: Harnessing the Power of Water - Inaya Aggarwal June 9, 2020 Anand Gupta now playing Adani Green Energy profit up nearly 95 pc to Rs 629 cr in Q1 - EQ June 9, 2020 Anand Gupta now playing Canadian and Indian solar firms join forces on US cell factory - EQ June 9, 2020 Anand Gupta now playing TP Renewable Microgrid, NDDB collaborate to boost renewable energy in dairy sector - EQ June 9, 2020 Anand Gupta now playing Work on West Kallada floating solar project to begin soon - EQ June 9, 2020 Anand Gupta now playing SECI FDRE Tender eBid Results - EQ June 9, 2020 Anand Gupta now playing POWER DEMAND IN INDIA - EQ June 9, 2020 Anand Gupta Appointment to the post of Director (Technical) – Reg. For more information please see below link: Related posts: Punjab has doubled its power generation: Deputy CM Betting on infrastructure, Africa eyes $ 100 bn bilateral trade with India Loadshedding to be a crime, metering to be pre-paid under govt’s 2019 ‘power for all’ plan Solar panel rule under HC lens 0 00 0 0 previous Energy transition: Hydrogen use in India's energy mix can grow 10 times by 2050 next Cooler weather, not lockdown leading to fall in Delhi's power demand Anand Gupta Editor - EQ Int'l Media Network Related Posts Work on West Kallada floating solar project to begin soon – EQ July 26, 2024 Anand Gupta 0 ReNew energizes Rajasthan with 400 MW solar launch, targets full 600 MW by October – EQ July 25, 2024 Anand Gupta 0 Hi-Tech Pipes aims 13.5 MW solar capacity for captive usage by Dec 2024 – EQ July 25, 2024 Anand Gupta 0