Seeking approval for change in the execution entity of 225 MW grid connected Wind-Solar Hybrid Power Projects
0
0
The Commission is not inclined to approve the change in executing entity of 225 MW grid connected Wind-Solar Hybrid Power Projects from
TPGEL to TPSL
Case of Tata Power Company Limited – Distribution seeking approval for change in the execution entity of 225 MW grid connected Wind-Solar Hybrid Power Projects from M/s Tata Power Green Energy Limited, a 100% subsidiary of The Tata Power Company Limited to M/s TP Saurya Limited, another 100% subsidiary of The Tata Power Company Limited.
For more information please see below link:
Related posts:
- Case of Shah Promoters and Developers seeking directions against MSEDCL for wrongful denial of Short-Term Open Access for the period 10 August, 2019 to 31August, 2019
- Case of The Tata Power (Transmission) to modify certain provisions of the MERC (Multi Year Tariff) Regulations, 2019
- Seeking directions against MSEDCL qua supply of power from its 5.6 MW Wind Turbine Generators located at Ahmednagar, Maharashtra
- Seeking clarification regarding the inapplicability of the bifurcated Solar and Non-solar targets