To treat Irumbai Village Solar PV Plant Project as a Special Joint Research and Study Project of TEDA and TANGEDCO
0
0
Tamil Nadu Energy Development Agency / To treat Irumbai Village Solar PV Plant Project as a Special Joint Research and Study Project of TEDA and TANGEDCO
For more information please see below link:
Related posts:
- Petition for implementation of the KUSUM (Component C) – Comments invited
- To accord approval for the proposed implementation of the KUSUM (Component C) Agricultural Solar Pump Scheme in 20,000 pump sets with 7.5 H.P load by installing 11 kW solar PV plant in each of the pump sets
- BTN Solar to issue appropriate direction to the respondent complete construction of requisite infrastructure beyond the Delivery Point required for evacuation of the entire contracted capacity of 100 MWs
- To pass an appropriate order for processing applications of willing consumers in solar net meter scheme for installation of additional capacity by change over from solar net meter scheme