![In the matter of: Petition to extend the Control Period of the benchmark capital cost and generic tariff](https://www.eqmagpro.com/wp-content/uploads/2021/03/Sunseap-completes-offshore-floating-solar-farm-in-Straits-of-Johor.jpg)
In the matter of: Petition to extend the Control Period of the benchmark capital cost and generic tariff
0
0
In the matter of: Petition to extend the Control Period of the benchmark capital cost and generic tariff.
For more information please see below link:
Related posts:
- UREDA Floates Tender For Offgrid Solar Power Plants at various locations in the State of Uttarakhand
- Uttarakhand to Install Solar Water Heating Systems In Various Locations
- Extension of the period of applicability of the benchmark capital cost and levellised generic tariff
- JERC RE Generic Tariff Order for FY 2021-22