1. Home
  2. Tenders
  3. Stakeholders Consultation Meeting for 100 MW (AC) Solar PV Power Plant at Chhattisgarh, India
Stakeholders Consultation Meeting for 100 MW (AC) Solar PV Power Plant at Chhattisgarh, India

Stakeholders Consultation Meeting for 100 MW (AC) Solar PV Power Plant at Chhattisgarh, India

0
0

Stakeholders Consultation Meeting: Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and O&M of SECI’s own 100 MW (AC) Solar PV Power Plant with Land having 10 years plant O&M at Chhattisgarh, India

SECI is organizing a Stakeholders Consultation Meeting regarding its upcoming project for the Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and O&M of SECI’s own 100 MW (AC) Solar PV Power Plant with Land having 10 years plant O&M at Chhattisgarh, India, which SECI is developing for South Eastern Coalfields Limited (SECL), one of the eight subsidiaries of Coal India Limited (CIL). Due to current pandemic situation on account of COVID19, the meeting shall be conducted online on 16.04.2021 at 1400 Hours, online link & other details of which will be shared soon.

The discussion aims to brief the various stakeholders about the Solar PV Project with land along with the wide spread out reach of the Project. Prospective bidders are kindly requested to make themselves available online for the said meeting as per the above-mentioned schedule. Maximum 02 (Two) persons from the respective Bidder company are allowed to attend the Meeting.

Prospective bidders are required to send in their confirmation mail at sandeeprana@seci.co.in to attend the Stakeholders Consultation Meeting latest by 15.04.2021.

Bidders are required to kindly be updated through SECIs website www.seci.co.in for any further updates regarding this Stakeholders meeting.

Anand Gupta Editor - EQ Int'l Media Network