1. Home
  2. Policy & Regulation
  3. Petition for adoption of tariff for the 2000 MW Solar Power Projects (Tranche-IX) connected to the Inter-State Transmission System (ISTS) and selected through Competitive Bidding Process – EQ Mag Pro

Petition for adoption of tariff for the 2000 MW Solar Power Projects (Tranche-IX) connected to the Inter-State Transmission System (ISTS) and selected through Competitive Bidding Process – EQ Mag Pro

0
0
Anand Gupta Editor - EQ Int'l Media Network