Petition for adoption of usage charges for 1,692 MW Solar Photovoltaic (PV) Power Station (Tranche-I & II) connected to the inter-State Transmission System and selected through competitive bidding process under‘ CPSU Scheme Phase-II – EQ Mag Pro
0
0
Petition for adoption of usage charges for 1,692 MW Solar Photovoltaic (PV) Power Station (Tranche-I & II) connected to the inter-State Transmission System and selected through competitive bidding process under CPSU Scheme Phase-II.
For more information please see below link:
Related posts:
- CERC Adopted Individual Tariff for 3 GW of the Power Projects
- Petition For Seeking Adjudication of Disputes With NTPC Limited And Northern Regional Load Despatch Centre
- Petition For seeking extension of time for interchange of power of Unit-I (660 MW) of Barh Super Thermal Power Station, Stage-I (3X660 MW) – EQ Mag Pro
- Petition for approval of tariff of Ramagundam Super Thermal Power Station Stage-III (500 MW) – EQ Mag Pro