![Petition for approval of tariff of Feroze Gandhi Unchahar Thermal Power Station Stage-II (420 MW) for the 2019-24 tariff period – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for approval of tariff of Feroze Gandhi Unchahar Thermal Power Station Stage-II (420 MW) for the 2019-24 tariff period – EQ Mag Pro
0
0
Petition for approval of tariff of Feroze Gandhi Unchahar Thermal Power Station Stage-II (420 MW) for the 2019-24 tariff period.
For more information please see below link:
Related posts:
- Petition For Truing up of Annual Fixed Charges For 2014-19 Tariff Period
- Petition For Approval of Tariff of Circulating Fluidized Bed Combustion (CFBC) Technology Based NLC Thermal Power Station-II
- Petition For Truing Up of Annual Fixed Charges For 2014-19 Tariff period in Respect of the Korba Super Thermal Power Station Stage
- Petition for revision of tariff of Ramagundam Super Thermal Power Station Stage-III (500 MW) – EQ Mag Pro