Petition for adoption of tariff for 8800 MW Solar Power Plants connected to ISTS linked with setting up of 2200 MW Solar Manufacturing Plant – EQ Mag Pro
0
0
Petition for adoption of tariff for 8800 MW Solar Power Plants connected to ISTS linked with setting up of 2200 MW Solar Manufacturing Plant.
For more information please see below link:
Related posts:
- Petition For Approval of Tariff of Meja Thermal Power Station Stage-I
- Petition for adoption of tariff for the 2000 MW Solar Power Projects (Tranche-IX) connected to the Inter-State Transmission System (ISTS) and selected through Competitive Bidding Process – EQ Mag Pro
- Petition for truing up of tariff for the period 2016-19 and multi-year tariff for the period 2019-24 in respect of 1200 MW Teesta III Hydro-electric project – EQ Mag Pro
- Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Project (Tranche-III) connected to the inter-State Transmission System – EQ Mag Pro