![Petition for truing-up of tariff for the 2014-19 tariff period and for determination of tariff for the 2019-24 tariff period in respect of Udupi Thermal Power Plant (1200 MW) – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for truing-up of tariff for the 2014-19 tariff period and for determination of tariff for the 2019-24 tariff period in respect of Udupi Thermal Power Plant (1200 MW) – EQ Mag Pro
0
0
Petition for truing-up of tariff for the 2014-19 tariff period and for determination of tariff for the 2019-24 tariff period in respect of Udupi Thermal Power Plant (1200 MW).
For more information please see below link:
Related posts:
- Petition For Determination of Tariff of 1200 MW Coal Based Power Project at Odisha
- Petition For Adoption of Tariff For Inter-State Transmission System Connected 1200 MW
- Petition For Adoption of Tariff For Inter-State Transmission System Connected 1200 MW, ISTS connected Solar PV Power Projects Under Open Category – EQ Mag Pro
- Petition for truing up of tariff for the period 2016-19 and multi-year tariff for the period 2019-24 in respect of 1200 MW Teesta III Hydro-electric project – EQ Mag Pro