![Petition for adoption of tariff for 8800 MW Solar Power Plant connected to ISTS linked with Setting-up of Solar Manufacturing Plant – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for adoption of tariff for 8800 MW Solar Power Plant connected to ISTS linked with Setting-up of Solar Manufacturing Plant – EQ Mag Pro
0
0
Petition for adoption of tariff for 8800 MW Solar Power Plant connected to ISTS linked with Setting-up of Solar Manufacturing Plant.
For more information please see below link:
Related posts:
- Petition for adoption of tariff for 8800 MW Solar Power Plants connected to ISTS linked with setting up of 2200 MW Solar Manufacturing Plant – EQ Mag Pro
- Petition For Truing up of Transmission Tariff of 2014-19 And Determination of Transmission Tariff of 2019-24 For Nineteen Transmission Assets
- Petition For Revision of Tariff For the Period 2014-19 And Determination of Tariff For the Period 2019-24 in Respect of Parbati-III Power Station NHPC Limited
- Petition for approval of tariff for the period from 30.9.2019 to 31.3.2024 for Khargone Super Thermal Power Station (1320 MW) – EQ Mag Pro