Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of Feroze Gandhi Unchahar Thermal Power Station Stage-IV (500 MW) NTPC Limited – EQ Mag Pro
0
0
Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of Feroze Gandhi Unchahar Thermal Power Station Stage-IV (500 MW) NTPC Limited.
For more information please see below link:
Related posts:
- Petition for adoption of usage charges for 1,692 MW Solar Photovoltaic (PV) Power Station (Tranche-I & II) connected to the inter-State Transmission System and selected through competitive bidding process under‘ CPSU Scheme Phase-II – EQ Mag Pro
- Petition for approval of tariff of Feroze Gandhi Unchahar Thermal Power Station Stage-II (420 MW) for the 2019-24 tariff period – EQ Mag Pro
- Petition for revision of tariff of Vindhyachal Super Thermal Power Station, Stage-I (1260 MW) for the period from 1.4.2014 to 31.3.2019 – EQ Mag Pro