![Commission passed order on Annual Performance Review/true-up of Transmission Corporation of Telangana Limited for FY 2020-21 for Transmission Corporation of Telangana Limited – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2020/07/TSERC-Commission-invites-comments-in-the-matter-of-Suo-Moto-determination-of-variable-cost-for-existing-biomass-bagasse-and-industrial-waste-based-power-projects-in-Telangana.jpg)
Commission passed order on Annual Performance Review/true-up of Transmission Corporation of Telangana Limited for FY 2020-21 for Transmission Corporation of Telangana Limited – EQ Mag Pro
0
0
Commission passed order on Annual Performance Review/true-up of Transmission Corporation of Telangana Limited for FY 2020-21 for Transmission Corporation of Telangana Limited.
For more information please see below link:
Related posts:
- Commission issues (NET METERING ROOFTOP SOLAR PV GRID INTERACTIVE SYSTEMS) FIRST AMENDMENT REGULATION, 2020
- Tamil Nadu Discom Extended Date for Suggestions on TSERC (Deviation Settlement Mechanism and related matters ) regulation, 2020
- Telangana State Electricity Regulatory Issues (Smart Grid) Regulation, 2021
- Commission invites Comments/ Suggestions/ Objections in the matter of consent of Power Usage Agreement entered between M/s.NTPC Limited and TSDISCOMs for procurement of 1692 MW Solar power – EQ Mag Pro