Intimation regarding withdrawal of the Draft Red Herring Prospectus (“DRHP”) filed by lnox Green Energy Services Limited (Earlier known as lnox Wind Infrastructure Services Limited (“IGESL”)
0
0
Intimation regarding withdrawal of the Draft Red Herring Prospectus (“DRHP”) filed by lnox Green Energy Services Limited (Earlier known as lnox Wind Infrastructure Services Limited (“IGESL”)
For more information please see below link:
Related posts:
- TNERC: Comprehensive Tariff Order on Solar Power
- Statement of Reasons for Draft UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2018
- Azure Power files petition to extend LTA start date and deadline for completion of transmission line
- Petition for determination of transmission tariff from COD for four assets under Transmission System for Ultra Mega Solar Park (750MW) in Rewa District, Madhya Pradesh – EQ Mag Pro