Determination of tariff of Tehri Hydroelectric Power Project, Stage-I (1000 MW) THDC India Limited.
For more information please see below link:
Related posts:
- Petition for revision of tariff of Tehri Hydroelectric Power Project, Stage-I (1000 MW) THDC India Limited – EQ Mag Pro
- Treatment of power drawn by CTU-connected 750 MW Rewa Solar Project during nongeneration night hours and during shutdown periods and determination of tariff thereof – EQ Mag Pro
- Petition for approval of tariff of Ratnagiri Power Station (1967.08 MW) for the period from 1.4.2019 to 31.3.2024 Ratnagiri Gas and Power Private Limited – EQ Mag Pro
- Jhajjar Power Limited has filed the present Petition of the PPA executed between the Petitioner and the Respondents seeking revision of the Contracted Capacity, Quoted Non-Escalable Capacity Charges – EQ Mag Pro