![Petition for seeking approval of Business Plan for the 5th year being FY 2023-24 of the 4th control period FYs 2019-24 – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2020/07/TSERC-Commission-invites-comments-in-the-matter-of-Suo-Moto-determination-of-variable-cost-for-existing-biomass-bagasse-and-industrial-waste-based-power-projects-in-Telangana.jpg)
Petition for seeking approval of Business Plan for the 5th year being FY 2023-24 of the 4th control period FYs 2019-24 – EQ Mag
0
0
Petition for seeking approval of Business Plan for the 5th year being FY 2023-24 of the 4th control period FYs 2019-24.
For more information please see below link:
Related posts:
- Petition For Seeking Appropriate Directions From The Commission to the Respondents
- Petition For Determination of the Tariff For 0.55 MW Mini Hydel Project
- MSR Mega Bio-Power Has Filed a Petition Seeking Determination of the Tariff For the Industrial Waste Based Power Plant of 7.5 MW
- Petition for Approval of Business Plan for Multi-Year Control Period from FY 2022-23 to FY 2024-25 – EQ Mag Pro