![Petition for adoption of tariff for Renewable Energy Projects connected to ISTS with Assured Peak Power Supply in India – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for adoption of tariff for Renewable Energy Projects connected to ISTS with Assured Peak Power Supply in India – EQ Mag
0
0
Petition for adoption of tariff for Renewable Energy Projects connected to ISTS with Assured Peak Power Supply in India.
For more information please see below link:
Related posts:
- Petition for adoption of tariff for 8800 MW Solar Power Plants connected to ISTS linked with setting up of 2200 MW Solar Manufacturing Plant – EQ Mag Pro
- Petition for adoption of tariff for 400 MW Renewable Energy Projects connected to Inter-State Transmission System and selected through competitive bidding process – EQ Mag Pro
- Petition for adoption of tariff for 1200 MW Wind Power Projects (Tranche – X) connected to the Inter-State Transmission System – EQ Mag Pro
- Petition of PPA executed between the Petitioner and Solar Energy Corporation of India Limited (SECI) for supply of 180 MW and 150 MW respectively – EQ Mag Pro