Petition for revision of tariff of Muzaffarpur Thermal Power Station Stage-I (220 MW) – EQ Mag
0
0
Petition for revision of tariff of Muzaffarpur Thermal Power Station Stage-I (220 MW).
For more information please see below link:
Related posts:
- Petition for revision of tariff of Kawas Gas Power Station (656.20 MW) for the 2014-19 tariff period, after the truing up NTPC Limited – EQ Mag Pro
- Petition for revision of tariff of Loktak Hydroelectric Power Station (105 MW) NTPC Limited – EQ Mag Pro
- Petition for revision of tariff of Bhilai Expansion Power Plant (500 MW) NTPC-SAIL Power Company Limited – EQ Mag Pro
- Petition for revision of tariff of Faridabad Gas Power Station (431.586 MW) NTPC Limited – EQ Mag