Petition for seeking permission to allow drawal of start-up power for Unit-2 (800 MW) of Telangana Ph-I (2X800 MW) – EQ Mag
0
0
Petition for seeking permission to allow drawal of start-up power for Unit-2 (800 MW) of Telangana Ph-I (2X800 MW).
For more information please see below link:
Related posts:
- Petition for grant of exemption from Technical Minimum operation for NLCIL TPS-II Expansion (2 x 250 MW) CFBC Units – EQ Mag Pro
- Petition with respect to grant of transmission licence to Khetri-Narela Transmission Limited – EQ Mag Pro
- Petition for revision of tariff for the 2014-19 tariff period in respect of Koteshwar Hydro Power Station (400 MW) – EQ Mag Pro
- Petition of PPA between Coastal Andhra Power Limited and Andhra Pradesh Power Coordination Committee for wrongful termination of the PPA by APSPDCL – EQ Mag