  3. Site visit & Pre-Bid meeting notification: Tender for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning including 5 Years Plant O&M of 2MW (AC) Solar PV Power Plant with 01 MWh BESS at KAZA, Himachal Pradesh.
Site visit & Pre-Bid meeting notification: Tender for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning including 5 Years Plant O&M of 2MW (AC) Solar PV Power Plant with 01 MWh BESS at KAZA, Himachal Pradesh.

Site visit & Pre-Bid meeting notification: Tender for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning including 5 Years Plant O&M of 2MW (AC) Solar PV Power Plant with 01 MWh BESS at KAZA, Himachal Pradesh.

0
0

Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India

Owner: Himachal Renewable Limited

Contract title: Tender for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning including 5 Years Plant O&M of 2MW (AC) Solar PV Power Plant with 01 MWh BESS at KAZA, Himachal Pradesh.

Tender No: SECI/C&P/MI/00/0011/2022-23

ETS ID: SECI-2023-TN000002

CPPP Tender ID: 2023_SECI_699848_1

Site Visit:

1. Prospective bidders may visit the site any day up to 04.03.2023. Bidders are requested to send a line of confirmation with planned dates for site visit at prashantu@seci.co.in and umesh.patidar@seci.co.in prior to commencement of site visit.

2. For logistics related queries for site visit, bidders may contact Shri Manish Arya, Sr Xen Elect Division , HPSEBL, Kaza ( Mob. No.: 7018466489).

For further details on the Project, bidders may contact Shri Atul Bhatia, Superintending Engineer Electrical (Design), HPSEBL (Mob. No.: 7833880514 or Er. Neelam, Senior Exec. Engineer, HPSEBL (Mob. No.: 9418856614)

Suggested Route Info:

Tentative time and distance for reaching the Project Site, from Shimla (by Road):

Shimla to Rampur : 140 km, (Duration 04:30 hr);

Rampur to Rekong Peo: 100 km (Duration: 4 hr);

Rekong Peo to Pooh: 60 km (Duration: 01:30 hr)

Total Shimla to Pooh: 300 km (Duration: 10 hr)

Pooh to Kaza: 140 km (05:30 hr)

Bidders may stay at Pooh, then visit site on subsequent day and come back to Pooh.

The Pre-bid meeting shall be held on 06.03.2023. The time and venue for the same shall be notified at a later date.