![Petition for seeking approval for scheduling of power for Chuzachen Hydro Electric Power Plant from Eastern Regional Load Dispatch Centre – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for seeking approval for scheduling of power for Chuzachen Hydro Electric Power Plant from Eastern Regional Load Dispatch Centre – EQ Mag
0
0
Petition for seeking approval for scheduling of power for Chuzachen Hydro Electric Power Plant from Eastern Regional Load Dispatch Centre.
For more information please see below link:
Related posts:
- Petition for seeking approval for scheduling power for Chuzachen Hydro Electric Power Plant from Eastern Regional Load Despatch Centre – EQ Mag Pro
- Petition for claiming for compensation due to levy of charges of transportation of fly ash as per the terms of PPA executed between the Petitioner and the Respondent – EQ Mag Pro
- Petition for seeking truing up of tariff for the 2014-19 Tariff Period in respect of Kahalgaon STPS Stage-I (840 MW) – EQ Mag Pro
- Petition for seeking extension/ deferment of Scheduled Commissioning Date for 45.6 MW out of the total 240 MW wind power project on account of Force Majeure events – EQ Mag Pro