Petition for determination of transmission tariff for the 2019-24 tariff period in respect of two number of assets under “Extension Works at Power Grid Sub-stations for Interconnection”
0
0
Petition for determination of transmission tariff for the 2019-24 tariff period in respect of two number of assets under “Extension Works at Power Grid Sub-stations for Interconnection of RE Projects
For more information please see below link:
Related posts:
- CERC Directs PGCIL Not to Encash Bank Guarantees of Terminated Wind Projects
- Petition for two assets under “Transmission system for evacuation of power from 10000 MW Neyveli Lignite Corporation Ltd. TS-1(Replacement) (NNTPS)” in the Southern Regional – EQ Mag Pro
- Petition for determination of tariff for the year 2020-21 to 2023-24 in respect of RVPNL-owned transmission lines/system connecting with other States and Intervening transmission lines – EQ Mag
- Petition for seeking directions from this Commission to PGCIL to extend the long term access start date and extend the deadline from completion of the dedicated transmission line – EQ Mag