![Status of allocation of bay(s) at the existing or the proposed ISTS sub-stations for Stage-II Connectivity – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2020/01/Draft-RERC-Terms-and-Conditions-for-Determination-of-Tariff-1st-Amendment-Regulations-2019-1.jpg)
Status of allocation of bay(s) at the existing or the proposed ISTS sub-stations for Stage-II Connectivity – EQ Mag
0
0
Status of allocation of bay(s) at the existing or the proposed ISTS sub-stations for Stage-II Connectivity.
For more information please see below link: