![Petition for determination of tariff for the inter-state transmission lines of the HVPNL for 2015-16 to 2018-19 – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for determination of tariff for the inter-state transmission lines of the HVPNL for 2015-16 to 2018-19 – EQ Mag
0
0
Petition for determination of tariff for the inter-state transmission lines of the HVPNL for 2015-16 to 2018-19.
For more information please see below link:
Related posts:
- Petition for adoption of tariff for 400 MW Renewable Energy Projects connected to Inter-State Transmission System and selected through competitive bidding process – EQ Mag Pro
- Petition for determination of tariff in respect of the Bairasiul Power Station (180 MW). NHPC India Limited (NHPC) – EQ Mag Pro
- Petition for adoption of tariff for Renewable Energy Projects connected to ISTS with Assured Peak Power Supply in India – EQ Mag
- Petition for truing up of annual fixed charges for the period 2014-19 and for determination of tariff for the period 2019-24 in respect of Maithon Hydel Power Station, Units-I to III (63.2 MW) DVC – EQ Mag