![Application under Sections 14, 15, 79(1)(e) of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations, 2009 with respect to Grant of Transmission License to WRSR Power Transmission Limited.](https://www.eqmagpro.com/wp-content/uploads/2023/04/CENTRAL-ELECTRICITY-REGULATORY-COMMISSION.png)
Application under Sections 14, 15, 79(1)(e) of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations, 2009 with respect to Grant of Transmission License to WRSR Power Transmission Limited.
0
0
Application under Sections 14, 15, 79(1)(e) of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations, 2009 with respect to Grant of Transmission License to WRSR Power Transmission Limited.
For More Details Click on Below Link :
Related posts:
- Petition for approval of transmission tariff from COD
- Petition for approval of levelized tariff discovered through transparent competitive bidding carried out by JVVNL for 4.24 MW pilot Solar Power Project – EQ Mag Pro
- Petition for revision of tariff of Singrauli Super Thermal Power Station (2000 MW) for the period from 1.4.2014 to 31.3.2019, after truing up exercise – EQ Mag
- In the matter of: PPAC on account of expected surge in Power Demand during Summer of FY 2023-24 – EQ Mag