1. Home
  2. Policy & Regulation
  3. Petition for approval of tariff of Talcher Super Thermal Power Station, Stage-II (2000 MW) for the period from 1.4.2019 to 31.3.2024. NTPC Limited – EQ Mag
Petition for approval of tariff of Talcher Super Thermal Power Station, Stage-II (2000 MW) for the period from 1.4.2019 to 31.3.2024. NTPC Limited – EQ Mag

Petition for approval of tariff of Talcher Super Thermal Power Station, Stage-II (2000 MW) for the period from 1.4.2019 to 31.3.2024. NTPC Limited – EQ Mag

0
0
Anand Gupta Editor - EQ Int'l Media Network