![Commission passed Order on Annual Performance Review/True-Up of State Load Despatch Centre for FY 2021-22 – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2020/07/TSERC-Commission-invites-comments-in-the-matter-of-Suo-Moto-determination-of-variable-cost-for-existing-biomass-bagasse-and-industrial-waste-based-power-projects-in-Telangana.jpg)
Commission passed Order on Annual Performance Review/True-Up of State Load Despatch Centre for FY 2021-22 – EQ Mag
0
0
Commission passed Order on Annual Performance Review/True-Up of State Load Despatch Centre for FY 2021-22.
For more information please see below link:
Related posts:
- Commission passed order on Annual Performance Review/true-up of Transmission Corporation of Telangana Limited for FY 2020-21 for Transmission Corporation of Telangana Limited – EQ Mag Pro
- Commission passed order in the matter of TSDISCOMS proposals for consent of the Commission for procurement of 1045 MW Solar power from NTPC under CPSU Scheme Phase-II Tranche-III – EQ Mag Pro
- Commission passed Order on Aggregate Revenue Requirement/ expected revenue from charges for FY 2023-24 for The co-operative electric supply society limited – EQ Mag
- Commission invites suggestions/comments from all stake holders on Draft TSERC RENEWABLE POWER PURCHASE OBLIGATION (Compliance by purchase of Renewable Energy/ Renewable Energy Certificates) – EQ Mag Pro